As a concrete mixing station is one of the two elements are necessary, plays a crucial role in the concrete mixer. Then, concrete mixer with all need to have what conditions?
First of all, the concrete mixer should be set in a flat place, so the tire in a vacant position, so as to avoid loosening during startup. The best performed for test run before mixing, ready to work. Note that, when commissioning shall test the mixing drum speed is appropriate, under normal circumstances, empty after loading slightly faster speed than 2-3, such as the difference between the more, should adjust the wheel and gear ratio.
Secondly, to carefully check all the parts in the concrete mixer before work, have a look the drive clutch and brake is flexible and reliable, the wire rope is damaged, the track pulley is good, there are no obstacles and around the various parts of the lubrication etc.. Make sure no problem and then to boot.
Third, if in the boot process, if it is found that the electrical or mechanical failure, should dischargemore than expected, such as troubleshooting power after operation. Of course, when in use,should always check, prevent the occurrence of safety accidents.
Finally, concrete mixer after use, pull off, lock the switch control box, remember to clean up, clean the site of health, let the machine to keep clean.
Haomei machinery equipment CO., LTD.
Email: ann@haomei.biz
Website: http://www.truck-mixer-cn.com
Office Add: No.14 Waihuan Road, New district, Zhengzhou, China
Tel: +86-371-65621392
Fax:+86-371-86616825