Concrete mixing station has good mixing performance, the equipment adopts a spiral type double horizontal shaft forced mixing console, not only mixer can be strong, for dry, rigid, plastic and various ratio of concrete can achieve good mixing effect. And stir evenly, high efficiency. Today to share Bowei machinery ready-mixed concrete mixing plant pneumatic auxiliary components fault.
Oil mist fault. The specific performance: the adjustment of the needle is too small to cause the blockage of the oil circuit, resulting in liquid oil droplets can not be atomization; or pipeline leakage caused by liquid oil droplets can not be atomization. Solution: adjust the amount of oil drops, so that it reached 30 drops /h belt type concrete batching plant, while checking and repair, replace the leakage of the oil pipe.
Automatic pollution discharge device fault. The specific performance is: the impurities in the oil droplets, such as clogging of the sewage discharge device, resulting in automatic drain plug. The solution is: open the automatic drain and clean up the structure of the plug.
Muffler failure. The concrete performance is: the structural element in the muffler is damaged and can not be silenced. Solution: replace the internal structural components of the muffler or directly replace the entire muffler.